NOTICE:


The team leader of the rock mucking loader construction team and the monitor of the gas safety of the squad leader must seriously strengthen the observation of the working surface of the tunnel muckin
read more
The closed rope fence of the rock mucking loader is made of waste air drill or 1/2" steel pipe and installed in two groups, fixed in the jack on the operating side, and the height is 0.3m higher than
read more
In order to ensure the safety of the bucket rock mucking loader during the transition period, corresponding countermeasures should be taken during mucking machine use:
read more
The closed rope guard of rock mucking loader machine is made and installed with two groups of waste air drill bit or 1 / 2 "steel pipe, which are fixed in the jack on the operation side, and the heigh
read more
The quality of a rock mucking loading machine hydraulic system depends not only on the rationality of the system design and the performance of the system components, but also due to the pollution prev
read more
Secondary maintenance of the rock mucking loader (1 maintenance per season): The administrative captain of the district team is fully responsible for each quarter, the technician in charge of the elec
read more
The mucking loading machine is more sensitive and reliable, and the consumption rate of the rock loading machine is also high. It is a loading equipment commonly used at home and abroad. At the same t
read more
At the end of each month, the deputy captain in charge of the electrical and mechanical rock mucking loading machine of the district team is responsible for the maintenance team composed of the driver
read more